Technology

Ensuring operation space

Please ensure that sufficient operation space is maintained for relative displacement so that the seismic isolation system does not come into contact with other structures such as piping during operation
Please also take sufficient care so that obstructions are not placed on or near the seismic isolation system after installation.

Where there are obstructions near the seismic isolation system

Where there are obstructions near the seismic isolation system

Where there is piping supported by the building near the ground fixing frame

Where there is piping supported by the building near the ground fixing frame.

Where there is piping supported by the ground near the building fixing frame

Where there is piping supported by the ground near the building fixing frame

Where there are obstructions near the seismic isolation system

Where there are obstructions near the seismic isolation system

Where there is piping supported by the building near the ground fixing frame

Where there is piping supported by the building near the ground fixing frame

Where there is piping supported by the ground near the building fixing frame

Where there is piping supported by the ground near the building fixing frame

Where there are obstructions near the seismic isolation system

Where there are obstructions near the seismic isolation system

Where there is piping supported by the building near the ground fixing frame

Where there is piping supported by the building near the ground fixing frame